FS.04Fleet Services // Land Evaluation
THE FLEET IS ONLY AS GOOD AS THE GROUND IT STANDS ON.
Split-screen due diligence: satellite imagery on the left, the technical ledger on the right. Evaluate mobility-hub land before the first vehicle arrives.

IMAGERY // CANDIDATE SITES, SATELLITE COMPOSITE
Site Ledger — Candidate Zones
ZONE A — COREPRIME
2 MVA capacity
Mixed-use, conditional permit
94
ZONE B — TRANSITVIABLE
1 MVA capacity
Industrial-light, permitted
78
ZONE C — PERIPHERYWATCH
600 kVA capacity
Agricultural transition
41
Evaluation Criteria
01
GRID CAPACITY
A 24-stall hub at 350 kW draws peak 2 MVA. Proximity to a substation is the first gate — sites beyond 2 km of a tie point often fail on upgrade cost alone.
02
ZONING CLASS
Fleet hubs classify as light-industrial or mixed-use. Jurisdictions with explicit AV-infrastructure codes (TX, AZ, NV) cut permit time by months.
03
DEMAND GEOMETRY
The hub must sit within a 6-minute deadhead of the demand centroid. Every extra minute is unpaid miles on every rotation.
04
LAND BASIS
Long-term ground lease beats purchase in year one. Hub land is an operating input, not an appreciating asset — keep the basis low.